Here is the solution for How should the administrator cable up the storage array to ensure redundancy and resiliency?. The solution is given after the options.

How should the administrator cable up the storage array to ensure redundancy and resiliency?
ISL the FC switches together
Cable both controller heads to one switch
Have at least one path from each controller head going to each fabric
Cable one controller port to one fabric and the other controller port to a second fabric
Correct AnswerHave at least one path from each controller head going to each fabric